Water outage: On Sunday, August 19, there was a water main break affecting many of the residents of Coronado Hills. All homes east of Indian Ridge (including that road) are out of water. Vallecitos crews are on site making the repairs. The estimated time for water service to be back on is Monday at 2:00 AM. We apologize for any inconvenience this may cause. 

Traffic alert: From August 6 through Monday, August 20, motorists can expect multiple lane closures along eastbound San Marcos Blvd. from Viewpoint Dr. to Knights Realm and westbound San Marcos Blvd. from Knights Realm to Rancho Santa Fe Ave. These closures will accommodate major roadway repair work resulting from the water main break that occurred on Tuesday, July 24 due to a decades-old corroded pipe. More info...

 

 

First Plan Check Submittal

Print
Press Enter to show all options, press Tab go to next option

Vallecitos Water District must review proposed water and sewer improvements from properties requesting water and sewer services. Vallecitos Water District standards require properties to connect to a District main line at the frontage of the property. Each parcel, existing or proposed must have frontage along water and/or sewer mains. Properties not having frontage along an existing water or sewer main may be required to extend the Distric main line to the property. An engineer would be retained by the owner to determine the cost estimate and design for the extension. The development plans and all extension design plans must be submitted for review.

First Plan Check Review Submittal

Improvement Plans and Grading Plans:
A project information worksheet, two complete bond copy sets of improvement plans and grading plans shall be submitted to the District's Development Services for review. Please refer to Checklist for Reviewing Improvement & Grading Plans Requirements.

Reference Materials:
One copy of all reference materials shall be submitted to aid in the plan checking process. Examples of reference material copies: approved tentative map, phasing plans, tract or parcel maps, adjacent maps, record of survey, assessor’s map book pages, etc.

Transmittal Letter:
A letter of transmittal from the project engineer shall be submitted to the District for each project. Each letter of transmittal should be on company letterhead, including the project engineers name and contact information, and requesting the commencement of the District plan check procedure.

Plan Check Deposit:
A deposit must be made to the District to initiate the plan check process. Please refer to Engineering Fees/Rates. The District currently only accepts cash or checks for deposits.

Plan Check Comments and Corrections:
After the first plan check, the District will return one red-lined set of each improvement plan and grading plan to the Engineer of Work. A District work order number will be assigned for project identification and should be included on all future correspondence.

 

<< Previous   |   Next >>  << Return to Plan Check Review

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer